10/4/2023 0 Comments Howell township code book![]() An above ground pool the 10 foot is measured from the coping around the pool to the property line. ![]() ![]() For an in ground pool the 10 foot is measured from any concrete around the pool to the property line. There is a minimum 10 foot setback required from the side and rear property lines of all pools, above ground and in ground alike. What is the required setback for a pool and how do I determine it? Yes, an application to the Land Use Office is required along with the survey reflecting the location of the improvement, depending on the extent of the improvement, the approval of both the Engineering and the Building Division may be required. Is a permit required for paver patio, concrete patio, sheds or retaining walls? Please contact the Building Department for additional requirements on fencing which is acting as a pool barrier. For properties on corner lots please see Question #10.įor properties with swimming pools, a building permit is also needed. Fencing in your side or rear yard is permitted to a maximum height of 6’ and can be solid/stockade. Fencing within a front yard is permitted with a maximum height of 4’ and it must be 50% open (i.e. ![]() Yes, an application to the Land Use Office is required along with a survey reflecting the location of the fencing. Does a fence replacement require a permit and what standards apply to fencing? Please follow the link below for information. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |